🛡️ Chemical & Pharma ERP: Regulatory compliance

Every licence, market and inspection, under control

Track licences and retention fees, product registrations in every market, changes and what each regulator needs to hear about them, self-inspections across FDA's six systems, 483 responses and CAPA. One calendar, with every due date owned.

Your plant6 markets
Dossiers

The CTD, and where your ERP data goes

Every regulated market accepts dossiers in the Common Technical Document format. Pick a module to see what it holds.

Change control

Know who has to hear about a change, before you make it

Pick a change. Each market lights up with the usual category. Illustrative only: your regulatory team sets the real mapping, and the system applies it every time.

  • Record and report later
  • Notify
  • Approval before use
Inspection readiness

Scored across FDA's six systems

FDA inspects drug plants by system. Here's a demo site's readiness score for each, from its own self-inspections and open items. Pick a system to see what's pulling it down.

After an inspection

From Form 483 to a closed CAPA

What happens after FDA leaves. The 15-business-day response is FDA's recommendation; the other days are an example plan. The system turns each observation into tracked work.

  1. Day 0Form 483 issuedObservations read out at the closing meeting. Each one is logged against a system.
  2. Day 3InvestigateScope, root cause and risk to patients and products.
  3. Day 10Plan actionsCorrective and preventive actions, owners and dates.
  4. Day 15RespondFDA recommends a response within 15 business days, signed by management.
  5. Day 90Check it workedEffectiveness checks with evidence, then closure.
How it works

From spreadsheets to one compliance system

Six steps to move licences, markets and QA onto one system.

  1. Step 1List licences and registrationsEvery licence, market and product.
  2. Step 2Load the calendarRenewals, reports and filing dates.
  3. Step 3Set up change controlImpact rules by market and change type.
  4. Step 4Connect QA recordsDeviations, CAPA, complaints and audits.
  5. Step 5Run a mock inspectionScore each system and close the gaps.
  6. Step 6Go liveReminders and dashboards for the team.
What it changes

Results regulatory, QA and management notice

What changes once compliance runs on one system.

No missed renewals

Every due date has an owner and a reminder.

Changes without surprises

Market impact known before a change is made.

Inspection-ready

Evidence for each system, one click away.

Faster responses

483 responses built from linked records.

Who it's for

Built for makers who answer to regulators

From domestic plants to exporters in regulated markets.

  • Exporters to regulated markets
  • WHO-GMP and PIC/S sites
  • API and bulk drug makers
  • Contract manufacturers
  • Domestic formulation makers
  • Specialty chemical makers
Chemical & Pharma ERP

Other modules in the suite

One integrated system.

FAQ

Regulatory compliance questions

Answers for regulatory affairs, QA heads and plant owners.

What does regulatory compliance software do for a pharma maker?

It keeps track of every licence, registration and filing, assesses changes for their impact in each market, runs self-inspections and CAPA, and keeps the evidence inspectors ask for linked to the records that produced it.

Do drug licences in India still expire?

Since the 2017 amendments to the Drugs and Cosmetics Rules, licences stay valid as long as the retention fee is paid every five years and the licence isn't suspended or cancelled. The system tracks each retention fee date with reminders.

How does change control show market impact?

Each change type is mapped to how each market treats it: record and report later, notify, or approval before use. The mapping is set up with your regulatory team and shown before the change is approved.

Can it help prepare for an FDA inspection?

Yes. Self-inspections are organised around FDA's six systems: quality, production, facilities and equipment, laboratory controls, materials, and packaging and labelling. Open items show where you're exposed.

How are Form 483 observations handled?

Each observation is logged, investigated and turned into CAPA with owners and dates. FDA's March 2026 draft guidance recommends responding within 15 business days, and the response pack is built from the linked records.

Does it manage dossiers?

It keeps the data behind CTD module 3: formulas, specifications, validation and stability. Dossier publishing itself is usually done in a specialist tool, and we can integrate with it.

Does it cover revised Schedule M?

Yes. Gap assessments, self-inspections, CAPA and the documents Schedule M asks for live in one place and link to batch, QC and equipment records.

Can it run annual product reviews?

Yes. Batches, deviations, OOS results, complaints, changes and stability for each product are rolled up for review.

How long does implementation take?

As an estimate, 6 to 10 weeks, depending on how many licences, markets and products you have and how many QA records need to move across.

Get In Touch

Ready for your next inspection, any day?

Tell us your licences, markets and products. We reply within 4 business hours and can demo with your own compliance calendar.

⏰
Response TimeWithin 4 business hours (your timezone)
Send Us a Message