🏭 Automotive ERP: Production planning

Plan to the OEM's latest schedule, and run to takt

Load EDI schedules from every OEM, set takt and balance the line, level the model mix, group press jobs to cut changeovers and explode the BOM so parts arrive on time. Re-plan in minutes when the next release lands.

900 parts
60 stakt time

OEM schedules

See what changed between releases, before you plan

Eight weeks of an OEM's schedule for one part. The first two weeks are firm, the next two are a trade-off zone where you can buy material, and the rest is forecast. Switch to the new release to see the changes. Demo data.

Mixed-model sequencing

Build the mix every hour, not in big batches

Three variants of one assembly, in a 6:3:1 mix. A batched day builds all of A, then B, then C, so suppliers and the line see big swings. A levelled (heijunka) sequence spreads them out.

  • A: Petrol, manual, 6 in 10
  • B: Petrol, automatic, 3 in 10
  • C: CNG, 1 in 10
Longest run of one variant0
Spacing of variant C0
Parts per cycle10
Changeovers

Win back press hours with smarter changeovers

Six jobs on one press line in a 16-hour day. Turn on quick changeover (SMED) to cut each changeover by half and see the time freed. Demo data.

  • Running
  • Changeover
  • Free time
Running0
Changeovers0
Free time0
MRP

From a delivery date back to every part's start date

One brake caliper assembly due on day 14. MRP works backwards through the bill of materials, offsetting each part by its lead time. Hover a bar to trace it.

How it works

From OEM schedule to a running plan

Six steps to bring planning onto one system.

  1. Step 1Connect OEM schedulesEDI, portals and spreadsheets in one feed.
  2. Step 2Load routings and BOMsParts, operations, cycle times and lead times.
  3. Step 3Set lines and shiftsCapacity, takt and changeover matrix.
  4. Step 4Plan and sequenceMPS, levelled mix and press schedules.
  5. Step 5Release to the floorWork orders, tablets and andon boards.
  6. Step 6Track and re-planPlan versus actual, re-plan in minutes.
What it changes

Results the plant, buyers and OEM notice

What changes once planning runs on one system.

On-time delivery

Schedules follow the OEM's latest release.

Less inventory

Levelled builds instead of safety stock.

More press hours

Smarter changeovers free capacity.

Faster re-planning

A new release re-planned in minutes.

Who it's for

Built for plants that supply the line

From a Tier 3 press shop to a Tier 1 assembly plant.

  • Tier 1 suppliers to OEMs
  • Tier 2 and Tier 3 component makers
  • Sheet metal and press shops
  • Casting, forging and machining units
  • Plastic and rubber part makers
  • Two-wheeler and tractor component plants
Automotive ERP

Other modules in the suite

One integrated system.

FAQ

Production planning questions

Answers for planners, plant heads and supply chain teams.

What is automotive production planning software?

It turns OEM schedules into plans your plant can run: a master schedule by line, takt and line balance, levelled sequences for variants, press and moulding schedules with sensible changeovers, and material plans from the BOM, all tracked against actual output.

How is takt time calculated?

Takt time is the available production time divided by customer demand. Two 450-minute shifts give 54,000 seconds; at 900 parts a day, takt is 60 seconds. Any station slower than that becomes the bottleneck.

Can it read OEM EDI schedules?

Yes. It takes forecast and call-off messages such as DELFOR and DELJIT, as well as portal downloads and spreadsheets, and compares each release with the last so changes stand out.

What are firm and forecast zones?

OEM schedules usually have a near-term firm period you're committed to build, a trade-off period where material can be bought, and a forecast beyond that. The system plans each zone differently.

Does it support just-in-sequence supply?

Yes. JIS call-offs are sequenced in the OEM's build order, with pick, pack and dispatch steps timed to the delivery window.

How does it reduce changeover losses?

Jobs that share tools, materials or settings are grouped, and a changeover matrix gives the time for each switch, so the schedule wastes fewer press or moulding hours.

Does it run MRP?

Yes. Demand is exploded through the BOM with lead times and stock, so purchase orders and shop orders start on time and shortages show early.

Does it help with IATF 16949?

It keeps the planning and capacity records IATF 16949 expects, and links to quality, supplier and delivery performance data in the suite.

How long does implementation take?

As an estimate, 8 to 12 weeks for one plant, depending on how many OEMs, parts and lines you have and how EDI is set up today.

Get In Touch

Ready to plan to every OEM release on time?

Tell us your OEMs, parts and lines. We reply within 4 business hours and can demo with one of your own schedules.

⏰
Response TimeWithin 4 business hours (your timezone)
Send Us a Message